Freeport-McMoRan (FCX) official guidance

Freeport-McMoRan (FCX) official earnings guidance and management outlook. Each figure management stated is shown with its revisions and the source quote.

See the full Filings Intelligence suite
FCXFREEPORT-MCMORAN INCFY2026 · ends 2026-12-31
1 metric1 maintained
earnings call · 3d
2026-10-27 15:52:08 UTC$1.6Bmaintained
The discretionary projects are expected to approximate $1.6 billion in 2026 and $2 billion in 2027, with roughly 50% related to the Kucing Liar development and the LNG project at Grasberg.
FCX · transcript · Q3 FY2026
2026-10-27 15:51:00 UTCOpen source
2026-10-27 12:10:12 UTC$1.6Bmaintained
Projected capital expenditures for major mining projects include $1.4 billion for planned projects, primarily associated with underground mine development and supporting mill and power capital costs in the Grasberg minerals district and a leaching project at El Abra, and $1.6 billion for discretionary growth projects.
FCX · EX-99.1 · Q3 FY2026
2026-10-27 12:08:34 UTCOpen source
2026-07-24 04:01:46 UTC$1.6Bmaintained
The discretionary projects are expected to approximate $1.6 billion in 2026 and $1.9 billion in 2027, with roughly 50% related to the Kucing Liar development and the LNG project at Grasberg.
FCX · transcript · Q2 FY2026
2026-07-24 04:00:00 UTCOpen source
2026-07-23 12:08:27 UTC$1.6Blowered -3.0%
Capital expenditures are expected to approximate $4.3 billion for the year 2026, including $3.0 billion for major mining projects. Projected capital expenditures for major mining projects include $1.4 billion for planned projects, primarily associated with underground mine development and supporting mill and power capital costs in the Grasberg minerals district and a leaching project at El Abra, and $1.6 billion for discretionary growth projects.
FCX · EX-99.1 · Q2 FY2026
2026-07-23 12:06:44 UTCOpen source
2026-04-24 04:01:43 UTC$1.6B – $1.7Braised +3.1%
The discretionary projects are expected to approximate $1.6 billion to $1.7 billion per year in 2026 and 2027.
FCX · transcript · Q1 FY2026
2026-04-24 04:00:00 UTCOpen source
2026-04-23 12:10:35 UTC$1.6Blowered -3.0%
Projected capital expenditures for major mining projects include $1.4 billion for planned projects, primarily associated with underground mine development in the Grasberg minerals district, and $1.6 billion for discretionary growth projects.
FCX · EX-99.1 · Q1 FY2026
2026-04-23 12:09:07 UTCOpen source
2026-01-23 05:01:32 UTC$1.6B – $1.7Bnew
The discretionary projects approximated $1.4 billion in 2025 and are expected to approximate $1.6-1.7 billion per year in 2026 and 2027, with roughly 50% related to the Kucing Liar development and the LNG project at Grasberg.
FCX · transcript · Q4 FY2025
2026-01-23 05:00:00 UTCOpen source
FCXFREEPORT-MCMORAN INCFY2027 · ends 2027-12-31
1 metric1 raised
earnings call · 3d
2026-10-27 15:52:08 UTC$2Braised +5.3%
The discretionary projects are expected to approximate $1.6 billion in 2026 and $2 billion in 2027, with roughly 50% related to the Kucing Liar development and the LNG project at Grasberg.
FCX · transcript · Q3 FY2026
2026-10-27 15:51:00 UTCOpen source
2026-07-24 04:01:46 UTC$1.9Braised +15.2%
The discretionary projects are expected to approximate $1.6 billion in 2026 and $1.9 billion in 2027, with roughly 50% related to the Kucing Liar development and the LNG project at Grasberg.
FCX · transcript · Q2 FY2026
2026-07-24 04:00:00 UTCOpen source
2026-04-24 04:01:43 UTC$1.6B – $1.7Bmaintained
The discretionary projects are expected to approximate $1.6 billion to $1.7 billion per year in 2026 and 2027.
FCX · transcript · Q1 FY2026
2026-04-24 04:00:00 UTCOpen source
2026-01-23 05:01:32 UTC$1.6B – $1.7Bnew
The discretionary projects approximated $1.4 billion in 2025 and are expected to approximate $1.6-1.7 billion per year in 2026 and 2027, with roughly 50% related to the Kucing Liar development and the LNG project at Grasberg.
FCX · transcript · Q4 FY2025
2026-01-23 05:00:00 UTCOpen source
FCXFREEPORT-MCMORAN INCFY2026 · ends 2026-12-31
1 metric1 maintained
earnings call · 3d
2026-10-27 15:52:08 UTC$4.4Bmaintained-2.1% vs FY2025
Our 2026 capital expenditure is currently estimated to approximate $4.4 billion, a 2% increase from the prior estimate, and $5.2 billion for 2027, an increase of approximately $400 million above the July estimate, primarily reflecting additional mining equipment investments for supporting enhanced productivity improvements in the U.S. and cost inflation.
FCX · transcript · Q3 FY2026
2026-10-27 15:51:00 UTCOpen source
2026-10-27 12:10:12 UTC$4.4Braised +2.3%-2.1% vs FY2025
Capital expenditures are expected to approximate $4.4 billion for the year 2026, including $3.0 billion for major mining projects. Projected capital expenditures for major mining projects include $1.4 billion for planned projects, primarily associated with underground mine development and supporting mill and power capital costs in the Grasberg minerals district and a leaching project at El Abra, and $1.6 billion for discretionary growth projects.
FCX · EX-99.1 · Q3 FY2026
2026-10-27 12:08:34 UTCOpen source
2026-07-23 12:08:27 UTC$4.3Bmaintained-4.3% vs FY2025
Capital expenditures are expected to approximate $4.3 billion for the year 2026, including $3.0 billion for major mining projects. Projected capital expenditures for major mining projects include $1.4 billion for planned projects, primarily associated with underground mine development and supporting mill and power capital costs in the Grasberg minerals district and a leaching project at El Abra, and $1.6 billion for discretionary growth projects.
FCX · EX-99.1 · Q2 FY2026
2026-07-23 12:06:44 UTCOpen source
2026-04-24 04:01:43 UTC$4.3Bmaintained-4.3% vs FY2025
Capital expenditures are similar to our prior estimates and are expected to approximate $4.3 billion in 2026 and $4.5 billion in 2027.
FCX · transcript · Q1 FY2026
2026-04-24 04:00:00 UTCOpen source
2026-04-23 12:10:35 UTC$4.3Blowered -2.3%-4.3% vs FY2025
Capital expenditures are expected to approximate $4.3 billion for the year 2026, including $3.0 billion for major mining projects.
FCX · EX-99.1 · Q1 FY2026
2026-04-23 12:09:07 UTCOpen source
2026-01-23 05:01:32 UTC$4.3B – $4.5Braised +2.3%
Capital expenditures for 2025 total $3.9 billion, $500 million below our plan going into 2025, and are expected to approximate $4.3-4.5 billion in 2026 and 2027.
FCX · transcript · Q4 FY2025
2026-01-23 05:00:00 UTCOpen source
2026-01-22 13:08:45 UTC$4.3Bnew
Capital expenditures are expected to approximate $4.3 billion for the year 2026, including $3.0 billion for major mining projects.
FCX · EX-99.1 · Q4 FY2025
2026-01-22 13:06:58 UTCOpen source
FCXFREEPORT-MCMORAN INCFY2027 · ends 2027-12-31
2 metrics1 raised1 maintained
earnings call · 3d
2026-10-27 15:52:08 UTC$5.2Braised +8.3%
Our 2026 capital expenditure is currently estimated to approximate $4.4 billion, a 2% increase from the prior estimate, and $5.2 billion for 2027, an increase of approximately $400 million above the July estimate, primarily reflecting additional mining equipment investments for supporting enhanced productivity improvements in the U.S. and cost inflation.
FCX · transcript · Q3 FY2026
2026-10-27 15:51:00 UTCOpen source
2026-07-24 04:01:46 UTC$4.8Braised +6.7%
Slide 11 shows our current forecast for capital expenditures in 2026 and 2027. Our 2026 capital remains consistent with our prior forecast, and 2027 capital expenditures are estimated at $4.8 billion, approximately $300 million above the April estimate, reflecting investments in upgraded mining equipment and revised cost estimates.
FCX · transcript · Q2 FY2026
2026-07-24 04:00:00 UTCOpen source
2026-04-24 04:01:43 UTC$4.5Braised +2.3%
Capital expenditures are similar to our prior estimates and are expected to approximate $4.3 billion in 2026 and $4.5 billion in 2027.
FCX · transcript · Q1 FY2026
2026-04-24 04:00:00 UTCOpen source
2026-01-23 05:01:32 UTC$4.3B – $4.5Bnew
Capital expenditures for 2025 total $3.9 billion, $500 million below our plan going into 2025, and are expected to approximate $4.3-4.5 billion in 2026 and 2027.
FCX · transcript · Q4 FY2025
2026-01-23 05:00:00 UTCOpen source
2026-10-27 15:52:08 UTC300Mmaintained
We've got 300 million pounds targeted in 2027 compared to just over 200 million pounds in 2026.
FCX · transcript · Q3 FY2026
2026-10-27 15:51:00 UTCOpen source
2026-10-27 12:10:12 UTC300Mlowered -25.0%
FCX is targeting an increase in production from these initiatives from the current run rate of approximately 220 million pounds of copper per annum to 300 million pounds in 2027, with potential for further significant increases in recoverable metal in future years.
FCX · EX-99.1 · Q3 FY2026
2026-10-27 12:08:34 UTCOpen source
2026-04-24 04:01:43 UTC400Mmaintained
This year, particularly in the second half, will be an important year as we get results from our heat trials, advance our additive deployment and work to scale next year to 400 million pounds per annum from this initiative and to define our path to 800 million pounds by as soon as 2030.
FCX · transcript · Q1 FY2026
2026-04-24 04:00:00 UTCOpen source
2026-01-23 05:01:32 UTC400Mnew
2026 we're looking at as a pivotal year for us in this initiative as we work to scale to 400 million pounds in 2027 and to 800 million pounds by 2030.
FCX · transcript · Q4 FY2025
2026-01-23 05:00:00 UTCOpen source
FCXFREEPORT-MCMORAN INCFY2030+ · ends 2030-12-31
1 metric1 new
earnings call · 3d
2026-10-27 15:52:08 UTC4.5B – 5Bnew
With our U.S. growth initiative as America’s Copper Champion, we see a path for Freeport to be a 4.5 billion to 5 billion pound a year copper producer in the 2030 timeframe, with success in our innovative leach initiative and our expansion of our Bagdad mine in Arizona.
FCX · transcript · Q3 FY2026
2026-10-27 15:51:00 UTCOpen source
FCXFREEPORT-MCMORAN INCFY2027 · ends 2027-12-31
1 metric1 new
earnings call · 3d
2026-10-27 15:52:08 UTC3.7Bnew
In the short term, we are positioned to grow from 3 billion pounds this year to 3.7 billion pounds in 2027 and over 4 billion pounds in 2028.
FCX · transcript · Q3 FY2026
2026-10-27 15:51:00 UTCOpen source
FCXFREEPORT-MCMORAN INCFY2028 · ends 2028-12-31
1 metric1 new
earnings call · 3d
2026-10-27 15:52:08 UTCat least 4Bnew
In the short term, we are positioned to grow from 3 billion pounds this year to 3.7 billion pounds in 2027 and over 4 billion pounds in 2028.
FCX · transcript · Q3 FY2026
2026-10-27 15:51:00 UTCOpen source
FCXFREEPORT-MCMORAN INCFY2027 · ends 2027-12-31
1 metric
earnings call · 3d
2026-10-27 15:52:08 UTCat least 20%20% vs FY2026
For the year 2027, we expect annual growth in copper sales of over 20% compared with 2026 and more than a 50% increase in gold volumes, with additional growth in 2028 of 10% for copper and 20% for gold.
FCX · transcript · Q3 FY2026
2026-10-27 15:51:00 UTCOpen source
2026-07-24 04:01:46 UTCat least 20%new20% vs FY2026
To 2027, we expect annual copper sales to increase by more than 20% compared with 2026, and gold volumes to increase by more than 50%, with additional growth projected in 2028 for both copper and gold.
FCX · transcript · Q2 FY2026
2026-07-24 04:00:00 UTCOpen source
FCXFREEPORT-MCMORAN INCFY2028 · ends 2028-12-31
1 metric
earnings call · 3d
2026-10-27 15:52:08 UTC10%10% vs FY2027
For the year 2027, we expect annual growth in copper sales of over 20% compared with 2026 and more than a 50% increase in gold volumes, with additional growth in 2028 of 10% for copper and 20% for gold.
FCX · transcript · Q3 FY2026
2026-10-27 15:51:00 UTCOpen source
2026-07-24 04:01:46 UTCadditional growth projectednew
To 2027, we expect annual copper sales to increase by more than 20% compared with 2026, and gold volumes to increase by more than 50%, with additional growth projected in 2028 for both copper and gold.
FCX · transcript · Q2 FY2026
2026-07-24 04:00:00 UTCOpen source
FCXFREEPORT-MCMORAN INCQ4 FY2026 · ends 2026-12-31
1 metric1 new
earnings call · 3d
2026-10-27 15:52:08 UTC17%new
We expect our fourth quarter of 2026 sales volumes to be the highest of the year, with copper sales increasing 17% and gold sales nearly tripling from third quarter levels.
FCX · transcript · Q3 FY2026
2026-10-27 15:51:00 UTCOpen source
FCXFREEPORT-MCMORAN INCFY2028+ · ends 2028-12-31
1 metric1 lowered
earnings call · 3d
2026-10-27 15:52:08 UTC$12B – $19.5Blowered -4.5%
Annual EBITDA would range from over $12 billion per annum at $5 copper to $19.5 billion at $7 copper, with operating cash flows ranging from over $9 billion per year at $5 to approximately $15 billion at $7 copper.
FCX · transcript · Q3 FY2026
2026-10-27 15:51:00 UTCOpen source
2026-07-24 04:01:46 UTC$13B – $20Braised +10.0%
Annual EBITDA would range from approximately $13 billion per annum at $5 copper to $20 billion at $7 copper, with operating cash flows ranging from approximately $9.5 billion per year at $5 and $15.5 billion at $7 copper.
FCX · transcript · Q2 FY2026
2026-07-24 04:00:00 UTCOpen source
2026-01-23 05:01:32 UTC$11B – $19Bnew
These are modeled results using the average of 2027 and 2028 with current volume and cost estimates and holding gold flat at $4,000 per ounce and moly flat at $20 per pound. Annual EBITDA would range from approximately $11 billion per annum at $4 per pound copper to over $19 billion per annum at $6 copper, with operating cash flows ranging from approximately $8 billion per year at $4 to over $14 billion per year at $6 copper.
FCX · transcript · Q4 FY2025
2026-01-23 05:00:00 UTCOpen source
FCXFREEPORT-MCMORAN INCFY2027 · ends 2027-12-31
1 metric
earnings call · 3d
2026-10-27 15:52:08 UTCat least 50%50% vs FY2026
For the year 2027, we expect annual growth in copper sales of over 20% compared with 2026 and more than a 50% increase in gold volumes, with additional growth in 2028 of 10% for copper and 20% for gold.
FCX · transcript · Q3 FY2026
2026-10-27 15:51:00 UTCOpen source
2026-07-24 04:01:46 UTCat least 50%new50% vs FY2026
To 2027, we expect annual copper sales to increase by more than 20% compared with 2026, and gold volumes to increase by more than 50%, with additional growth projected in 2028 for both copper and gold.
FCX · transcript · Q2 FY2026
2026-07-24 04:00:00 UTCOpen source
FCXFREEPORT-MCMORAN INCQ4 FY2026 · ends 2026-12-31
1 metric1 new
earnings call · 3d
2026-10-27 15:52:08 UTCgold sales nearly tripling from third quarter levelsnew
We expect our fourth quarter of 2026 sales volumes to be the highest of the year, with copper sales increasing 17% and gold sales nearly tripling from third quarter levels.
FCX · transcript · Q3 FY2026
2026-10-27 15:51:00 UTCOpen source
FCXFREEPORT-MCMORAN INCFY2028+ · ends 2028-12-31
1 metric1 lowered
earnings call · 3d
2026-10-27 15:52:08 UTC$9B – $15Blowered -4.0%
Annual EBITDA would range from over $12 billion per annum at $5 copper to $19.5 billion at $7 copper, with operating cash flows ranging from over $9 billion per year at $5 to approximately $15 billion at $7 copper.
FCX · transcript · Q3 FY2026
2026-10-27 15:51:00 UTCOpen source
2026-07-24 04:01:46 UTC$9.5B – $15.5Braised +13.6%
Annual EBITDA would range from approximately $13 billion per annum at $5 copper to $20 billion at $7 copper, with operating cash flows ranging from approximately $9.5 billion per year at $5 and $15.5 billion at $7 copper.
FCX · transcript · Q2 FY2026
2026-07-24 04:00:00 UTCOpen source
2026-01-23 05:01:32 UTC$8B – $14Bnew
These are modeled results using the average of 2027 and 2028 with current volume and cost estimates and holding gold flat at $4,000 per ounce and moly flat at $20 per pound. Annual EBITDA would range from approximately $11 billion per annum at $4 per pound copper to over $19 billion per annum at $6 copper, with operating cash flows ranging from approximately $8 billion per year at $4 to over $14 billion per year at $6 copper.
FCX · transcript · Q4 FY2025
2026-01-23 05:00:00 UTCOpen source
FCXFREEPORT-MCMORAN INCFY2027
1 metric1 maintained
earnings call · 3d
2026-10-27 15:52:08 UTC80%maintained
We continue to target overall rates reaching 80% by mid-2027 and approach full capacity by the end of next year.
FCX · transcript · Q3 FY2026
2026-10-27 15:51:00 UTCOpen source
2026-10-27 12:10:12 UTC80%maintained
PTFI continues to expect to reach 80% of capacity in mid-2027 and approach full capacity by year-end 2027.
FCX · EX-99.1 · Q3 FY2026
2026-10-27 12:08:34 UTCOpen source
2026-07-24 04:01:46 UTC80%maintained
Consistent with our April update, we continue to target overall rates in the district approximating 65% of full capacity in the second half of this year, reach 80% by mid-2027, and approach full capacity by the end of 2027.
FCX · transcript · Q2 FY2026
2026-07-24 04:00:00 UTCOpen source
2026-07-23 12:08:27 UTC80%maintained
PTFI’s overall production rates are expected to approximate 65% in the second half of 2026, 80% by mid-2027 and approach full capacity by the end of 2027.
FCX · EX-99.1 · Q2 FY2026
2026-07-23 12:06:44 UTCOpen source
2026-04-23 12:10:35 UTC80%new
PTFI’s overall production rates, which were previously forecast to approximate 85% of capacity in the second half of 2026 and reach 100% of capacity by the end of 2027 are now expected to approximate 65% in the second half of 2026, 80% by mid-2027 and approach full capacity by the end of 2027.
FCX · EX-99.1 · Q1 FY2026
2026-04-23 12:09:07 UTCOpen source
FCXFREEPORT-MCMORAN INCFY2026 · ends 2026-12-31
1 metric1 maintained
earnings call · 3d
2026-10-27 15:52:08 UTC$1.9maintained
On net unit cash costs, we are maintaining our full year guidance for 2026 of $1.90 per pound, with by-products, particularly molybdenum, providing an offset to the impact of higher input costs.
FCX · transcript · Q3 FY2026
2026-10-27 15:51:00 UTCOpen source
2026-10-27 12:10:12 UTC$1.9maintained
Based on achievement of current sales volume and cost estimates and assuming average prices of $4,000 per ounce of gold and $32.00 per pound of molybdenum in fourth-quarter 2026, consolidated unit net cash costs (net of by-product credits and excluding idle facility and restoration costs) for FCX’s copper mines are expected to average $1.90 per pound of copper for the year 2026 (including $1.68 per pound of copper in fourth-quarter 2026).
FCX · EX-99.1 · Q3 FY2026
2026-10-27 12:08:34 UTCOpen source
2026-07-23 12:08:27 UTC$1.9lowered -2.6%
Based on achievement of current sales volume and cost estimates and assuming average prices of $4,000 per ounce of gold and $30.00 per pound of molybdenum for the second half of 2026, consolidated unit net cash costs (net of by-product credits and excluding idle facility and restoration costs) for FCX’s copper mines are expected to average $1.90 per pound of copper for the year 2026 (including $2.00 per pound of copper in third-quarter 2026).
FCX · EX-99.1 · Q2 FY2026
2026-07-23 12:06:44 UTCOpen source
2026-04-23 12:10:35 UTC$1.95raised +11.4%
Based on achievement of current sales volume and cost estimates and assuming average prices of $4,500 per ounce of gold and $25.00 per pound of molybdenum for the remainder of 2026, consolidated unit net cash costs (net of by-product credits and excluding idle facility and restoration costs associated with the September 2025 mud rush incident at PTFI) for FCX’s copper mines are expected to average $1.95 per pound of copper for the year 2026 (including $2.24 per pound of copper in second-quarter 2026).
FCX · EX-99.1 · Q1 FY2026
2026-04-23 12:09:07 UTCOpen source
2026-01-22 13:08:45 UTC$1.75new
Consolidated unit net cash costs (net of by-product credits and excluding idle facility costs and direct recovery expenses associated with the September 2025 mud rush incident at PTFI) for FCX’s copper mines are expected to average $1.75 per pound of copper for the year 2026 (including $2.60 per pound of copper in first-quarter 2026), based on achievement of current sales volumes and cost estimates, and assuming average prices of $4,000 per ounce of gold and $20.00 per pound of molybdenum for the year 2026.
FCX · EX-99.1 · Q4 FY2025
2026-01-22 13:06:58 UTCOpen source
FCXFREEPORT-MCMORAN INCFY2033+ · ends 2033-12-31
1 metric1 maintained
earnings release · 3d
2026-10-27 12:10:12 UTC$4Bmaintained
As of September 30, 2026, PTFI has incurred approximately $1.6 billion for Kucing Liar development, and capital investments are estimated to approximate an additional $4 billion through 2033 (averaging approximately $0.5 billion per year).
FCX · EX-99.1 · Q3 FY2026
2026-10-27 12:08:34 UTCOpen source
2026-01-22 13:08:45 UTC$4Bnew
At December 31, 2025, PTFI has incurred approximately $1.1 billion for Kucing Liar, and capital investments are estimated to approximate an additional $4 billion through 2033 (averaging approximately $0.5 billion per year).
FCX · EX-99.1 · Q4 FY2025
2026-01-22 13:06:58 UTCOpen source
FCXFREEPORT-MCMORAN INCFY2026 · ends 2026-12-31
2 metrics2 maintained
earnings release · 3d
2026-10-27 12:10:12 UTC$3Bmaintained
Capital expenditures are expected to approximate $4.4 billion for the year 2026, including $3.0 billion for major mining projects. Projected capital expenditures for major mining projects include $1.4 billion for planned projects, primarily associated with underground mine development and supporting mill and power capital costs in the Grasberg minerals district and a leaching project at El Abra, and $1.6 billion for discretionary growth projects.
FCX · EX-99.1 · Q3 FY2026
2026-10-27 12:08:34 UTCOpen source
2026-07-23 12:08:27 UTC$3Bmaintained
Capital expenditures are expected to approximate $4.3 billion for the year 2026, including $3.0 billion for major mining projects. Projected capital expenditures for major mining projects include $1.4 billion for planned projects, primarily associated with underground mine development and supporting mill and power capital costs in the Grasberg minerals district and a leaching project at El Abra, and $1.6 billion for discretionary growth projects.
FCX · EX-99.1 · Q2 FY2026
2026-07-23 12:06:44 UTCOpen source
2026-04-23 12:10:35 UTC$3Bmaintained
Capital expenditures are expected to approximate $4.3 billion for the year 2026, including $3.0 billion for major mining projects.
FCX · EX-99.1 · Q1 FY2026
2026-04-23 12:09:07 UTCOpen source
2026-01-22 13:08:45 UTC$3Bnew
Capital expenditures are expected to approximate $4.3 billion for the year 2026, including $3.0 billion for major mining projects.
FCX · EX-99.1 · Q4 FY2025
2026-01-22 13:06:58 UTCOpen source
2026-10-27 12:10:12 UTC$1.4Bmaintained
Projected capital expenditures for major mining projects include $1.4 billion for planned projects, primarily associated with underground mine development and supporting mill and power capital costs in the Grasberg minerals district and a leaching project at El Abra, and $1.6 billion for discretionary growth projects.
FCX · EX-99.1 · Q3 FY2026
2026-10-27 12:08:34 UTCOpen source
2026-07-23 12:08:27 UTC$1.4Bmaintained
Capital expenditures are expected to approximate $4.3 billion for the year 2026, including $3.0 billion for major mining projects. Projected capital expenditures for major mining projects include $1.4 billion for planned projects, primarily associated with underground mine development and supporting mill and power capital costs in the Grasberg minerals district and a leaching project at El Abra, and $1.6 billion for discretionary growth projects.
FCX · EX-99.1 · Q2 FY2026
2026-07-23 12:06:44 UTCOpen source
2026-04-23 12:10:35 UTC$1.4Bnew
Projected capital expenditures for major mining projects include $1.4 billion for planned projects, primarily associated with underground mine development in the Grasberg minerals district, and $1.6 billion for discretionary growth projects.
FCX · EX-99.1 · Q1 FY2026
2026-04-23 12:09:07 UTCOpen source